Solar PV Panels installed
13/12/15 15:45
The PV Panels were finally fitted during a 'quiet' period in the wind on Monday. But Sundog were the only team at work with Henry and Gideon forced to stay at home because of the flood damage to the rail network. Normal service resuming on the Tuesday. 16 of the 17 327 watt panels are shown below. The PV inverter still awaits final commissioning.
By Wednesday the site was in full flow with plumber and electricians joining the main team. Arranging all the pipes and cables requires thought and the main 'highway' on the ground floor is starting to look a little crowded.
By Wednesday the site was in full flow with plumber and electricians joining the main team. Arranging all the pipes and cables requires thought and the main 'highway' on the ground floor is starting to look a little crowded.