Six skips have already been used

The demolition work continues nears the end of week three but will take a break when the steels arrive next week.

Most of the plaster has been removed from the masonry to reveal generally sound masonry part from in the offset where remedial work will be needed. The plaster hid Victorian luxuries such as lead gas pipes for internal lights.

The removal of the paster means that we should gain an extra 20mm to the length and breadth of the ground and first floors. It does mean I will have to recalculate the Treated Floor Area yet again to input into the final version of the PHPP software!