Parging

This week the Plastering team have been busy applying a Parge coat (a thin sand/cement mix) to the internal face of the masonry walls. This is to help prevent air leakage - masonry is far from free of cracks and gaps.
Parging

One of the first jobs the main contractor undertook was the site office (or OSB Palace). This takes advantage of the existing water and power supply. The separate toilet was the one we used in the cellar with a macerator and pump. It all easily fits on the concrete base of a former garage.

Cabin


CabinInterior

Liam found the leather settee awaiting collection by the bin men!

Chris phoned up Burlington slates to see when we might expect them - we paid for them over two months ago. Apparently they should be ready in a week or so. I will be very pleased when they finally arrive - Burlington are currently quoting a six-month lead time!
I suggest if you want to reroof in 2016 you place the order now.